The Mason County Lesson: Why BESS Siting Matters for Hill Country Property Owners
News • BESS • Property Rights
A Mason County battery storage site was built about 60 feet from a family’s home. Reporting shows blocked sale, construction damage claims, and ongoing noise — a cautionary lesson for Hill Country property owners.
Battery Energy Storage Systems (BESS) are not a theoretical issue for the Texas Hill Country. They are already being built — and when they are placed too close to homes, real families pay the price.
In Mason County, reporting from KVUE and the San Antonio Express-News documented what happened when a roughly 10-megawatt BESS project (Regis Mason) was built about 60 feet from the home of Chris and Catherine Dyer on Post Hill Street in Mason.
According to that reporting:
- The family listed their home for roughly 14 months; they cut the price repeatedly; buyers walked because of the planned or arriving battery farm; the home came off the market without a sale.
- Construction noise and vibration were intense enough that the family reported cracks in the home, and damage talks with the developer did not resolve the problem.
- After construction, cooling equipment and facility noise continued close to the property line. The City of Mason helped install a tall wooden fence — about 10 feet — but the Dyers said it did not fix the underlying problem: the site was too close.
- They stopped entertaining on their patio. Livability, not just scenery, was affected.
That is the Mason County lesson: harm to property can start at announcement and siting — not only after a fire. Neighbors should not have to wait for a disaster to learn that industrial battery containers do not belong in someone’s backyard.
Important clarification: Mason County also has a larger Bat Cave energy storage installation farther down Post Hill. The neighbor impacts described above are tied in public reporting to the smaller Regis Mason facility next to the Dyer home — not that larger site. Facts matter.
Why This Matters in Kerr County
As President of the Chapter 391 Sub-Regional Planning Commission, I am leading a regional fight against Battery Energy Storage Systems invading Kerr, Kendall, and Gillespie Counties. The goal is simple: protect Hill Country communities, public safety, rural character, groundwater, and private property before bad siting becomes someone else’s “lesson.”
Mason County shows what happens when setbacks fail and industrial storage is dropped next to residences. Kerr County families deserve better planning, stronger oversight, and commissioners who will finish the fight — not discover the problem after the containers are already humming behind a fence.
I will continue working with our regional partners, state regulators, and local citizens to keep BESS from being forced onto the Hill Country on terms that put neighbors last.
Service Before Self means protecting the people who live here — their homes, their safety, and their right to enjoy their property.
Sources
- KVUE Defenders reporting on the Mason County / Post Hill Street BESS neighbor impacts (Chris Dyer).
- San Antonio Express-News coverage of Texas energy storage and Hill Country resident pushback (Chris & Catherine Dyer; Regis; ~60 feet).
- Menard News & Messenger correction distinguishing Regis Mason (~9.9–10 MW, near residence) from Bat Cave (~100 MW).
Share this update
— Rich Paces, Kerr County Commissioner, Precinct 2
Comments
Please keep comments respectful and on-topic. Foul language is not permitted. Comments stay visible for 30 days.
Loading comments…